top of page

Our procedure 

This is our procedure of prepping to install glued or nailed down floor systems on a concrete slab. First, we will thoroughly inspect the slab for levelness, make any correction if necessary, apply a heavy coat of tar, lay down a 6 mil plastic sheet (visqueen), then we install (1/2 inch for glued down), (3/4 inch for nailed down) plywood fastened to the slab by 2 1/2 inch pins, every 2 feet apart. Now we are ready to install either type of floor.   If it is a typical residential or commercial wood framed structure on a second floor, glued or nail down installation, the previous described procedure isn't necessary. Please take a look at the pics below. 

© 2004 - 2023 Intellectual Property.

All rights reserved. DBAs and logos on this site are property of

The Greenyell-o Group LLC.

​

4floorz.com twitter
  • Facebook Clean
  • LinkedIn Clean
  • Google+ Clean
  • Facebook Social Icon
  • Yelp Social Icon
  • Our YouTube Channnel
  • Pinterest Social Icon
  • Instagram Social Icon
  • LinkedIn Social Icon
bottom of page